Intelligence – Insight – Ingenuity

Machine finish allowances

When machining castings, it is always advisable to discuss with the foundry the method of machining and the locations to be used as datums for each operation. As will be seen on the notes regarding tolerances, the dimensional relationship between different areas on a casting varies according to the die and mould construction.

The need for a cnc machinist and die designer to co-operate cannot be over emphasised. Frequently, the cost of finished castings can be significantly reduced by arranging for casting feeders to be located on areas which are to be machined. This minimises the need for fettling, and eliminates the feeder witnesses on the finished component.

Below is a table showing the amount of metal normally added for machining. The amount of material to be added is related to the overall size of the casting, rather than varying with individual dimensions. The designer should select that line on the table below showing the range within which the casting's greatest dimension falls.

Greatest Dimension Sand Cast Gravity Die Cast with Sand Cores Gravity Die Cast Pressure Die Cast
less than 150mm 1.5 1.5 1.125 0.375
150-300mm 2.25 2.25 1.5 0.5
300-450mm 3.0 3.0 1.875 0.625
450-600mm 3.75 4.5 2.25 0.75

The values given in the above table are based on maximum 'build-up' or a 'safety factor' for average casting variations in flatness, squareness, concentricity, etc., as well as linear tolerance. The values are the minimum recommended, and taper, when required, must be added to the above values.

Notes for Designers of Non-Ferrous Castings

DOWNLOAD NOW Guides 

MRT | Design-Advice-Brochure

HOW can MRT Castings help you?

I want...

New at MRT Blogs

Brother U500Xd2 - MRT Castings

Once again, MRT Castings have partnered with Brother and their UK agent, Whitehouse Machine Tools – a relationship that has spanned more than 25 years.

Read More
Cast Metal Engineers Event - MRT Castings

At a time when young engineering talent is in short supply, MRT Castings is taking a proactive approach to recruitment. 

Read More

Unit 4 Rebuild

11th Sep 2025

Unit 4 After

MRT is delighted to announce the completion of the latest phase of our on-site redevelopment programme.  Following the relocation to our new foundry building in 2021, Unit 4, the erstwhile home of our diecasting operations, was left empty and to be honest, a little worse for wear.

Read More